Before a compressed-air audit, assemble the information that helps the study reflect actual production. The aim is to define the system boundary, measurement period and decisions the team needs to make.
Gather the existing information
Compressor, dryer, receiver and control-system details.
Operating schedules, load changes and planned expansion.
Electricity tariffs and available energy records.
Required pressure and air quality at critical users.
Known leaks, pressure problems and maintenance concerns.
Agree the scope and responsibilities
Confirm measurement locations, access, work permits, production constraints and the responsible site contacts. Identify whether the proposed scope includes leakage, treatment, storage, controls or only selected equipment.
Define the expected deliverable
Ask for the baseline, findings, recommended changes and the assumptions behind any cost estimate. Confirm how proposed improvements will be prioritized and checked after implementation.
Preparing for a Compressed Air System Audit
Before a compressed-air audit, assemble the information that helps the study reflect actual production. The aim is to define the system boundary, measurement period and decisions the team needs to make.
Gather the existing information
Agree the scope and responsibilities
Confirm measurement locations, access, work permits, production constraints and the responsible site contacts. Identify whether the proposed scope includes leakage, treatment, storage, controls or only selected equipment.
Define the expected deliverable
Ask for the baseline, findings, recommended changes and the assumptions behind any cost estimate. Confirm how proposed improvements will be prioritized and checked after implementation.
Read about the benefits of a compressed-air audit
Discuss your application
Discuss the audit scope
Back to all Fluid Flow insights
Fluid Flow Team
Equipment guidance, application stories and company news from Fluid Flow.
Recent Posts